Finally after 2 years of planning and construction the loop is closed and the the attention, that the locomotive is running over the edge, is over.
– 1.5 tons of gravel
– 600 kg of concrete
– 60 kg of jigstones
– 50 meters of tracks
– 5 switches
– 2 bridges