While building the bridge, it wasn’t possible to create it in one piece. So I had build three parts and assemble them as soon as I am able to fill them with concrete at there final position. But there were two rows of jigstones missing to make it complete.
Today I finalized these two rows in order to create a frame for the concrete, that will fill up the building as soon as it got dry. Well – there was a certain risk, building it today. We have pretty warm weather today, but the meteorolists told us this morning, that lightings are high potential possible.