3RD JOINT AND ELECTRICAL WORK

Another nice saturday – so time to proceed to work in the garden. So I build the basement for further tracks and installed the thrid joint of the station. That was a little tricky, because I had to lengthen the tracks to fit. Anyway – I got it done 🙂

As you may know from some previous posts, I install some entry points for the power supply every 2 to 3 meters (6 to 9 feet). Inbetween the entry points I have put a tube into the gravel, that is usually used for electrical installations. I try to keep it straight. So it’s getting a nobrainer to push the cables in after the entry points are fixed.

Leave a Reply

Your email address will not be published. Required fields are marked *

*