Prepearation for the last step of track extention for 2017. Goal is to get the tracks in front of the waterfall. So about 5 meters (15 feet) are missing. To keep the grass away from the tracks, a speparation need to be made. First step was to lay down some stones in the way the separation is planed. Second step is to cut off the grass. For getting an idea, how it would look alike, I simply put the tracks temporarly on the earth.