CONCRETE BASE

The concrete base for the bridge is build. I put round about 100kg of concrete into the earth in order to get a solid and stable base for the bridge. I also added some iron in it to get the pylons rock solid. Maybe the iron is still to long. But then I will cut them down to the right length/height.

Tomorrow will be (hopefully) good weather. That’s at least, what the meteorolists are telling us. Maybe the concrete is already that dry, that I’m able to put the pylons on it and fix them with some cement, before filling them up with concrete as well….

Leave a Reply

Your email address will not be published. Required fields are marked *

*